Aseptic Tank Rigging and Setting

Project Scope

Over a three day period, our Industrial team completed the rigging and setting of two 35,500-pound aseptic tanks into a bottling production facility.

They used a Versalift and TriLifter to get the 30-foot-tall tanks into the building. Once inside, the tanks were carried through narrow aisles where two carry deck cranes stood them upright with only eight feet of headroom. The aseptic tanks safely store liquids while they wait to be processed and packaged.

Division

Industrial

Location

Pennsylvania