Professional Boulevard Bridge

Project Scope

Kinsley Construction built a new 300-foot, four-lane bridge over Antietam Creek. Our scope included the removal of an existing cul-de-sac, utility work, a new storm drain and 3,000 linear feet of road base and asphalt paving. The three-span steel girder bridge was constructed with drilled caisson foundations, concrete footings and substructures, and included a concrete deck with traffic barriers and pedestrian walkways. In addition, our Site crew constructed four reinforced retaining walls and several storm drain structures for the project.

Division

Civil (Highway & Bridge)

Market

Transportation

Location

Maryland

Client

Washington County, Maryland