Kinsley Construction is developing 44 acres over two phases for a new residential community. Phase 3A required developing 13 acres to create 31 single-family lots. Our scope included:

Performing 27,000 yards of rough and finish grading
Moving 55,500 cubic yards of cut-to-fill
Stripping 6,500 cubic yards of topsoil
Performing blasting for both mass excavation and select utility needs
Upgrade the water, sewer and storm systems
Constructing a new sediment basin featuring a cast-in-place concrete weir wall outlet structure
Curb installation and paving

Completing in the summer of 2025, Phase 3B requires developing 31 acres to create 101 more lots. Our work includes:

Constructing earth dikes and sediment weir walls
Stripping 11,000 cubic yards of topsoil
Drilling, blasting and moving approximately 100,000 cubic yards of cut-and-fill material
Installing all water, sanitary and storm drainpipes
Curbing, paving, asphalt trails and sidewalks in common areas
Completing with temporary seeding, signage, and line striping