Project Scope
Kinsley Construction is developing 44 acres over two phases for a new residential community. Phase 3A required developing 13 acres to create 31 single-family lots. Our scope included:
Performing 27,000 yards of rough and finish grading
Moving 55,500 cubic yards of cut-to-fill
Stripping 6,500 cubic yards of topsoil
Performing blasting for both mass excavation and select utility needs
Upgrade the water, sewer and storm systems
Constructing a new sediment basin featuring a cast-in-place concrete weir wall outlet structure
Curb installation and paving
Completing in the summer of 2025, Phase 3B requires developing 31 acres to create 101 more lots. Our work includes:
Constructing earth dikes and sediment weir walls
Stripping 11,000 cubic yards of topsoil
Drilling, blasting and moving approximately 100,000 cubic yards of cut-and-fill material
Installing all water, sanitary and storm drainpipes
Curbing, paving, asphalt trails and sidewalks in common areas
Completing with temporary seeding, signage, and line striping
Division
Civil (Site)
Market
Residential
Location
West Virginia
Client
US Home Corporation
Size