Lake Williams Dam

Project Info

Kinsley’s Industrial team completed phase one of this project, which included:

  • Installing an access road and temporary water barrier
  • Removing soils and sediment from the existing outlet pipe opening and headwall
  • Completing concrete modifications to enclose the existing headwall
  • Fabricating and installing stainless steel liners in the newly enclosed headwall
  • Removing sections of the existing dam and installing cast-in-place concrete grade beams to the top
  • Fabricating and installing galvanized steel platforms, which cantilever from the existing pedestrian road over the dam
  • Installing sluice gates, operator stems and trash racks provided by York Water Company
Project:

Dam and Spillway Repair and Rehabilitation

Division:

Industrial

Market:

Utilities/Infrastructure

Location:

York County, PA

Client:

The York Water Company