Phillips Mill Road Bridge

Project Info

The Kinsley highway and bridge team is replacing a 62-year-old bridge over the stream of Winters Run. The bridge superstructure will consist of a concrete deck placed over four, 30-inch by 36-inch, precast, pre-stressed, concrete box beams. The bridge substructure consists of reinforced concrete abutments with footings founded on micropiles. The project is scheduled for completion in March.

The project includes the following:

  • Reconstruction of 550 feet of approach roadway
  • Two large bio-swales for storm water management
  • Riprap for slope and channel protection

 

Project:

Bridge Replacement

Division:

Highway & Bridge

Market:

Transportation

Location:

Forest Hill, MD

Client:

Harford County

Architect:

Greenman-Pederson, Inc.

Size:

53 feet by 30 feet